Pool Planning
Pool Equipment Planner
Sizing equipment one box at a time is how pools end up with a filter that is too small for the pump or a heater that never reaches temperature. This planner starts from the pool itself: its volume, its climate and the turnover you want.
From that single set of facts it builds a coordinated plan - how long the pump should run, what flow that needs, the filter area for that flow, the heater size to hold your temperature, and a salt or chlorine setup - and it shows every number so you can check it against the shelf.
Quick answer
A pool on an 8-hour turnover needs about 42 gpm for a 20,000-gallon pool - and that one flow is what sizes the filter and the heater too.
Calculator
Quick result
| Pool volume | 16,831 gal (63,712 L) |
|---|---|
| Surface area | 450 sq ft (41.81 m²) |
| Turnover target | 8 h for one full pass |
| Turnover flow | 35.1 gpm (133 L/min) |
| Filter | 1.8 sq ft Sand |
| Heater | 128,388 BTU/h (37.6 kW) |
| Sanitiser | Chlorine, 3-7.8 ppm FC |
Pump and circulation
| System flow | 35.1 gpm (133 L/min) |
|---|---|
| Flow per hour | 2,104 gph |
| One full turnover | 480 min |
| Run time | 8 h/day |
| Split into 2 sessions | 4 h each |
Filtration
| Media | Sand |
|---|---|
| Filter area (design) | 1.8 sq ft (0.17 m²) |
| Smallest that stays in band | 1.4 sq ft |
| Oversized (slow end) | 2.3 sq ft |
| Rate band | 15-25 gpm/sq ft |
| Cleaning | Backwash when the gauge reads 8-10 psi above the clean pressure |
Heating
| Climate air temperature | 64°F (18°C) |
|---|---|
| Target water temperature | 82°F (28°C) |
| Temperature lift | 18°F |
| Heat-up load (24 h) | 128,388 BTU/h (37.6 kW) |
| Standing loss | 65,732 BTU/h (19.3 kW) |
| Recommended heater | 128,388 BTU/h (37.6 kW) |
| Evaporation | 181 gal/day (685 L/day) |
| Cover effect | No cover - the standing loss is at its full value |
Sanitising
| System | Chlorine |
|---|---|
| Free chlorine band | 3-7.8 ppm (target 4.8) |
| Planning CYA | 40 ppm |
| Daily loss covered | 2 ppm of chlorine a day in sun |
| Daily dose | 2.81 lb (about 37 fl oz) |
| Product concentration | 10% available chlorine (liquid sodium hypochlorite) |
Basic maintenance
| Circulation | 8 h for one full turnover, about 8 h of run time a day |
|---|---|
| Filter cleaning | Backwash when the gauge reads 8-10 psi above the clean pressure |
| Water testing | Free chlorine and pH 2-3 times a week; alkalinity, calcium and CYA monthly |
| Sanitiser | Never let free chlorine fall to zero; dose to the tested target, not a habit |
| Cover | Add a cover: it cuts evaporation and heat loss more than any other change |
Enter valid dimensions or a volume to be able to save this pool.
Next steps
How the plan is built
Everything starts with the turnover: the flow that pushes the whole volume through the filter in your target window - gallons divided by the turnover hours times 60.
The filter area is that flow divided by the media's rate: about 20 gpm per square foot for sand, 2 for DE and 0.375 for cartridge, so the same flow needs very different filters.
The heater is sized to whichever is larger - the energy to raise the pool to temperature in 24 hours, or the energy to replace what evaporates while it holds that temperature.
The salt or chlorine plan comes straight from the dosing engines, so the planner and the standalone calculators never disagree.
Worked example
A 20,000-gallon in-ground pool, 450 sq ft surface, warm climate (76°F air), target 84°F, sand filter, chlorine, 8-hour turnover:
1. Turnover flow = 20,000 ÷ (8 × 60) ≈ 41.7 gpm, so the pump runs about 8 hours a day
2. Sand filter area = 41.7 ÷ 20 ≈ 2.1 sq ft (12 sq ft would be far too small; 106 sq ft is the cartridge equivalent)
3. Heat-up = 20,000 × 8.34 × 8 ÷ 24 ÷ 0.82 ≈ 68,000 BTU/h; standing loss ≈ 29,000 BTU/h, so the heater is sized at 68,000 BTU/h
4. Chlorine to cover a 2 ppm daily loss ≈ 3.3 lb of 10% liquid a day
The pool bought one piece at a time
An owner has a 16 x 32 ft pool, 5 ft deep - about 19,000 gallons - and fits a small 50 sq ft cartridge filter because it was on offer. The turnover flow for 8 hours is about 40 gpm, but a 50 sq ft cartridge can only pass around 19 gpm before the media is overloaded, so the pressure climbs, the flow drops and the water slowly goes cloudy.
Run the same pool through the planner instead: about 40 gpm matches a 2 sq ft sand filter or a 106 sq ft cartridge, a 100,000 BTU/h heater holds the temperature against a cool night, and the chlorine plan calls for roughly 3 lb of 10% liquid a day. Every part is now sized off the same flow.
Input assumptions
- Volume and surface area are derived from your pool shape and dimensions using the shared pool geometry
- The climate band is a single planning air temperature, not a seasonal model
- The heater is sized for a 24-hour heat-up, with standing loss from the shared evaporation estimate
- The sanitising plan uses the default product concentration, unless the manual specifies a different target range
Related calculators
FAQ
Sources
- PHTA Certified Pool Operator (CPO) dosing conventions — Standard dosing tables, ppm-to-weight relationships, turnover and filter-rate guidance · Pool & Hot Tub Alliance (PHTA) · verified 2026-09-29
- Residential filter rate bands used on this page — Planning rates for sand (15-25), DE (1.5-2) and cartridge (0.25-0.375) gpm per square foot of media area.
- Pool turnover guidance used on this page — One full turnover per day as the residential default; confirm against the equipment manufacturer's manual.
- ASHRAE Handbook - Fundamentals (water properties) — Specific heat and latent heat of water used in the heater and evaporation estimates · ASHRAE · verified 2026-09-29
See our methodology page for how formulas are selected and reviewed, or start with the pool guides for the numbers in the right order.